VT-55 ARV 1:72
1
October 2, 2019upper and lower hull2
October 2, 2019tracks3
October 2, 2019a lot of them small parts4
October 2, 2019some larger parts5
October 2, 2019PE6
October 4, 2019Then you pay 45€ for a resin kit, these are the instructions, and the only parts resembling the parts given are the wheels and upper hull, most parts don't look like the drawing or are mounted in a complete different way... Sigh7
October 14, 2019thickness of the fenders ok on this side8
October 14, 2019but not on this side9
October 14, 2019some scraping later...10
October 14, 2019added the torsion bars.11
October 16, 2019fenders are a bit warped12
October 16, 2019pure gold in this case...13
October 16, 2019left rear was still a bit warped, but this is corrected now14
October 16, 2019Cleaning up the membranes in the wheel openings...15
October 21, 2019before(R) and after(L)16
October 21, 2019and the other side17
October 21, 2019baseplate of the working platform soldered18
October 21, 2019bottomside of the platform19
October 21, 2019almost finished the sides of the platform. Took me a while to figure out how these were mounted, but these are ingenious... one outer shell with raised detail, one inner shell with lowered detail and the railings, nicely fitting together20
October 21, 2019baseparts for the material boxes.. this is the easy part..21
October 21, 2019now I have to add a ton of these22
October 21, 2019like this... and when you take up these parts with tweezers... they are invisible...23
October 21, 2019made some progress clearing all the openings in the wheels... Over halfway...24
November 3, 2019platform almost ready25
November 3, 2019platform almost ready26
November 3, 2019platform almost ready27
November 3, 2019first box ready28
November 3, 2019first box ready29
November 3, 2019cut some (very) tiny pieces of solder30
November 3, 2019apply these to the corresponding places with a bit of flux and heat them up31
November 3, 2019minimal amount of tin where needed32
November 3, 2019apply some tin to the parts while at the fret and cut them as close to the edge as possible33
November 3, 2019add some flux, flas-ce the part in it and heat it up with the soldering iron... all done.34
November 3, 2019nice collection....35
December 7, 2019models cannot fly... unfortunately it came down as a tank...36
December 10, 2019restored, so far no holes drilled and copper bars added... hope it won't be a necessity37
December 10, 2019started dressing up and looking how the fit will be38
December 10, 2019started dressing up and looking how the fit will be39
December 10, 2019how the tracks are molded40
December 10, 2019tracks will be a real pain to clean, let alone to make em fit ....41
December 13, 2019first piece almost cleaned... 1.5h for this... still a lot to do...42
December 13, 2019Remade the support for the crane to get rid of the gaps43
December 13, 2019Better fit, crane itself is also better aligned44
December 13, 2019next problem, dozer blade in "up" position45
December 13, 2019remade the cylinder46
December 13, 2019and mounted, still needs to be cut at length47
December 13, 2019Cast cilinder removed48
December 13, 2019dry-fit